IEEE Std C37.246-2017 pdf download – IEEE Guide for Protection Systems of Transmission-to-Generation Interconnections

02-26-2022 comment

IEEE Std C37.246-2017 pdf download – IEEE Guide for Protection Systems of Transmission-to-Generation Interconnections.
4. Establishing interconnection 4.1 General design approach When considering a design approach for transmission-to-generation interconnections, the type of new generation that is added to the system has already been selected through careful planning by the generator and transmission owners. For example, demand at various loading conditions could have necessitated a need for a gas-fired peaking plant, or new generation could be required to replace a decommissioned coal-fired unit. In addition, the state could have a clean power initiative that would involve adding a solar or wind turbine facility. The new project should go through a formal process beginning with an interconnection request. Once this has been approved through the authority having jurisdiction, a technical evaluation of the proposed interconnection should be obtained. A generation interconnection study is performed to validate the impact of the proposed generation and to identify system upgrades required to accommodate the proposed generation in order to maintain proper and reliable operation of the transmission system. There are unique modeling requirements for different types of generation, including renewable resources such as wind and solar energy, which provide intermittent output and fault current magnitude challenges versus a typical synchronous machine. The interconnection study provides technical details about not only the proposed interconnection location for the new generation facility but also the impact to other customers and the surrounding transmission system. The technical details, including power system analysis data and transmission system upgrades required for the generation interconnection, are included in the guide. The information provided in this guide should be helpful to the project as it relates to the overall design approach.
The general design approach should be coordinated between the generator and transmission owners. Typically, the design responsibility for the generator owner ends at the agreed-upon point of change of ownership between the transmission and generator owners. Considerations for the design approach as it relates to protection systems are detailed later in this guide. For example, generator ground protection needs to be coordinated with the transmission line relays. A similar philosophy is required for backup distance or voltage-controlled time overcurrent protection. Utilizing the data obtained during the information exchange is essential for the engineer. This data allows the engineer to complete the protection study for the interconnection, and this guide should help to design reliable protection schemes.

Download infomation Go to download